2016-07-13
1. Installation of public equipment; 2. Compressed air system, water system, vacuum system installation, nitrogen generation system; 3. Primary and secondary power distribution system; 4. Steel structure design and construction;2016-07-13
1. Coater and domestic and foreign suppliers to maintain a good long-term cooperation; 2. Rich experience, can assist the whole plant planning and design;2016-07-13
1. Design, manufacture and installation of NMP duct system for cathode coater; 2. Design, manufacture and installation of air duct system of anode coater; 3. Design and construction of exhaust heat recovery system for anode and cathode coater;2016-07-13
1. Installation of large mixer; 2. Installation of homogenizing system; 3. Design, manufacture and installation of steel structure platform for homogenization system; 4. Design and installation of slurry system pipeline transportation;2016-07-13
1. Thermal system design, procurement, construction integration (heat transfer oil, steam); 2. Procurement and installation of boilers, auxiliaries, pumps and valves; 3. Design and construction of pressure piping system; 4. Low nitrogen transformation and maintenance of boiler system;2016-07-13
1. The design and construction of NMP storage and transportation system are integrated; 2. The design and construction of electrolyte storage and transportation system are integrated; 3. Design, supply and construction of electrolyte premixing and preparation system;